Project:

Western Reserve Group – Class A Office Building
Wooster, OH

Description:

Mechanical, Electrical and Plumbing design of a ground-up, four-story, Class A office building, including a conditioned connecting bridge to an already existing office building.

Summary of Services:

  • Mechanical, Electrical and Plumbing System Design.
  • Construction Administration Services including submittal review, response to RFI’s and site observation reports.
  • Documentation of MEP systems for the purpose of obtaining energy credits from local utility companies.

System Design Highlights:

  • The project consisted of two 40,000 CFM built-up air handling units, a hot water boiler system serving perimeter heating/reheat systems, air cooled chilled water system and heat/ventilation for a maintenance shop.
  • Electrical lighting and power design for the facility.
  • Mechanical, Electrical and Plumbing design for an onsite fitness center.
  • The project was drafted in REVIT which provided a three dimensional model for multi-trade coordination.

Unique Project Challenges:

  • Providing high level temperature control required for Class A Space while maintaining efficiency and affordability.

Construction Cost:

$30,000,000

Project Completion Date:

Currently Under Construction